THOUSANDS ARE GOING FACTORY DIRECT FOR FIBERGLASS IN GROUND SWIMMING POOLS

Fiberglass
IN GROUND
Swimming Pools

Fiberglass IN GROUND Swimming PoolsFiberglass IN GROUND Swimming PoolsFiberglass IN GROUND Swimming Pools

Fiberglass
IN GROUND
Swimming Pools

Fiberglass IN GROUND Swimming PoolsFiberglass IN GROUND Swimming PoolsFiberglass IN GROUND Swimming Pools
  • Home
  • Why Fiberglass?
  • Models
  • VIP Premium Program
  • Equipment:
  • Details
  • Reviews
  • Locations
    • Columbia SC
  • Salt Systems: Uh Oh!
  • More
    • Home
    • Why Fiberglass?
    • Models
    • VIP Premium Program
    • Equipment:
    • Details
    • Reviews
    • Locations
      • Columbia SC
    • Salt Systems: Uh Oh!
  • Home
  • Why Fiberglass?
  • Models
  • VIP Premium Program
  • Equipment:
  • Details
  • Reviews
  • Locations
    • Columbia SC
  • Salt Systems: Uh Oh!

Your Quote includes:

Swimming Pool

Swimming Pool

Swimming Pool

Your selected model is manufactured with the most robust process known in the fiberglass industry.  Multi-million dollar yachts are made this way. 

Delivery

Swimming Pool

Swimming Pool

We ship your Swimming Pool with our trucks and our drivers from the factory to your Home.

In The Ground

Swimming Pool

Equipment Package

Our factory crew will excavate the hole, place the pool in the hole, back fill the hole, level your pool, brace up the pool,  grade around the pool, hook up the skimmer and two returns plus piping and fittings to the pump and filter and in line chlorinator unit.

Equipment Package

Equipment Package

Equipment Package

Our approach is for YOU to have minimal maintenance requirements for your Swimming Pool thus we have designed our system and associated equipment components to do just that!  We use Hayward products and the highest quality materials for the Installation of your pool. Hatteras factory personnel will make sure that you know just as much or even more than the local swimming pool company in regards to maintaining your pool with just the right amount of chemistry which saves you money and protects the health and well being of your family and friends. That is why we do NOT recommend certain chemicals or equipment. 

Concrete

Equipment Package

Electrical

We will provide 4 feet of concrete (cantilever deck) with bull nose finish (upcharge) around the perimeter of your pool.  Additional concrete is available for an up-charge at $8.00 per square ft. 

Electrical

Equipment Package

Electrical

Our factory electrician pulls the permit and takes care of your electrical needs so that your pump/filter units are operational as well as the LED light(s) for your Swimming Pool.  We exclusively use only LED lights for efficiency and safety. The LED assembly is 12 V (low voltage) plus the through-wall fitting is made of high grade plastic (no metal) thus no parts are subject to rust or deterioration.

Hatteras pools

Buxton, Hatteras Blue

    Hatteras Pools 704-269-8440

    Phenomenal Fiberglass Shells for over 25 Years!

    Copyright © 2019 Hatteras Pools - All Rights Reserved.